Junction box terminal numbering

By a practising automation / electrical engineer with more than ten years · Updated 2026-11-22

Enter JB name, strip capacity (1–96), and spare percent (0–50). Terminals are numbered 1…N. Spares are reserved from the end of the strip. This is a planning list, not a manufacturing terminal-strip drawing.

24 terminals · 2 spare (from 23)

  1. JB-01-1
  2. JB-01-2
  3. JB-01-3
  4. JB-01-4
  5. JB-01-5
  6. JB-01-6
  7. JB-01-7
  8. JB-01-8
  9. JB-01-9
  10. JB-01-10
  11. JB-01-11
  12. JB-01-12
  13. JB-01-13
  14. JB-01-14
  15. JB-01-15
  16. JB-01-16
  17. JB-01-17
  18. JB-01-18
  19. JB-01-19
  20. JB-01-20
  21. JB-01-21
  22. JB-01-22
  23. JB-01-23 (spare)
  24. JB-01-24 (spare)

How junction box terminals are numbered

Terminals in a junction box are numbered sequentially from one, and the spare range is reserved at the end of the strip. A 24-terminal strip with 10 percent spare shows terminals 1 to 22 in use and 23 to 24 spare, so additions and rework land in the empty tail rather than forcing a new box.

Numbering is per strip, not per box. A JB can hold several strips — one per field cable, or one per voltage class — and each strip restarts at 1. The full reference is the box, then the strip, then the terminal: JB-01, strip S-1, terminal 3.

Why spares matter

Commissioning always finds something that was not on the drawing: an extra alarm, a signal that needs re-routing, a device replaced by one with an extra contact. A strip built to 100 percent with no spare means re-terminating live or pulling a new core. The reserved tail is cheap insurance.

The checker here plans the split — total capacity, spare percent, and the resulting in-use and spare ranges — and exports a CSV you can carry into a strip schedule. It is a planning list, not a manufacturing terminal-strip drawing.

Keeping numbering consistent with the drawings

The terminals you plan here must match the terminals printed on the loop sheets and the termination list. That is why the project generates all three from one IO list: the JB, strip, and terminal cells on each signal feed the loop diagram, the termination list, and the strip plan at once.

If you number a strip by hand, keep the same JB, strip, and terminal fields on the IO list so the generated drawings agree. Where a cell is blank, the project auto-assignment fills it from strip capacity rather than guessing an address.

Frequently asked questions

Why are spares reserved at the end?

So later additions and rework land in the empty tail of the strip without disturbing the ordered field wiring, or forcing a new junction box.

Can a junction box have more than one strip?

Yes, and each strip restarts numbering at 1. Reference a terminal as box, strip, then terminal, for example JB-01 S-1 terminal 3.

Does this produce a strip drawing?

No. It produces a planning list you can export as CSV. The terminal-strip drawing is a separate, later deliverable.