Changelog

Dated, public release notes. Proof the tool is alive and maintained.

2026-11-22

Home title matches instrument loop diagram demand

  • Homepage title is now Instrument Loop Diagram Generator. DataForSEO (2026-11-22) shows that phrase at 90 US / 720 worldwide monthly searches and keyword difficulty 3; the previous “loop diagram generator” title has no measurable Ads volume. Bare “loop diagram”, “cable schedule”, “termination diagram”, and “loop sheet” SERPs are polluted (causal-loop, TV, electrical photos, Velcro). No new URLs. Log: docs/seo.md.

2026-11-21

Cable schedule template title matches Search Console

  • /templates/cable-schedule title is now Free Cable Schedule Template Excel, matching the query already ranking at position 14. SEO log lives at docs/seo.md.

2026-11-17

Named hosting sub-processor

  • /sub-processors names Hetzner Online in Nuremberg, DE for application compute, Postgres, and artifact storage.

2026-11-16

security@ mailbox, Strict Zero-AI Mode, and PO quotations

  • NDA, DPA, and security questionnaires go to security@schematicforge.com. Support, invoices, and engineering stay on contact@.
  • Strict Zero-AI Mode is the named default. Guest preview never calls Google Gemini. Signed-in projects can opt in to header-and-sample mapping.
  • Request a commercial quotation (SFQ) for PO / Net-30 from pricing or checkout. Card checkout remains Paddle.

2026-11-15

About and bylines use a generic engineer, not a named founder

  • About, article JSON-LD, and public bylines identify a practising automation / electrical engineer with more than ten years. No personal name on public pages.

2026-11-14

contact@schematicforge.com and Resend for account email

  • Public contact, invoices, and transactional From use contact@schematicforge.com. Account email is sent through Resend. Cloudflare Email Routing receives inbound mail.
  • /sub-processors lists Resend in place of Gmail SMTP. Support still replies the same day.

2026-11-14

4–20 mA, valve Cv, orifice, RTD, and thermocouple calculators

  • Five no-signup calculators: 4–20 mA scaling, liquid valve Cv, orifice-plate screening flow, IEC 60751 Pt100, and IEC 60584 Type K/J. Wiring reference stays at /tools/4-20ma-wiring.
  • Ungated FAT checklist and cause-and-effect matrix XLSX templates. Not ISA/IEC certified, not a generated loop sheet, not AutoCAD/EPLAN.

2026-11-12

Close account, terms checkbox, and Gmail as sub-processor

  • Register requires a terms and privacy checkbox. Team → Close account deletes the signed-in user, projects, and drawings.
  • /sub-processors names Gmail SMTP for verification and receipt email. Production verify, reset, invite, and checkout return URLs use LOOPGEN_APP_URL only.

2026-11-11

Guest loop sheet, claim generate, and sub-processor list

  • Homepage IO preview now draws one watermarked sheet from the visitor file. Claiming the upload assigns drawing numbers, generates the first field-wired loop, and opens that drawing. Unverified accounts can view SVG on screen; DXF and PDF still need a verified email.
  • /sub-processors lists Google Gemini (optional column mapping) and Cloudflare (CDN and bot protection). Guest IO preview is rate-limited.
  • Public pages send named Plausible funnel events (preview, sheet, claim click, alarm check) with no file contents, tags, or plant data. App and auth routes stay excluded.

2026-11-07

In-app ISA-18.2 projects and DCS export how-tos

  • Alarm is a first-class project type from the same New project button. Rates count ALARM/SIS_ALARM annunciations only. PDF, workbook, and a draft DCS CSV download from the project.
  • Eight how-to-export guides: DeltaV Event Chronicle, Ovation, Experion, 800xA, CENTUM, PCS 7, AVEVA, and Ignition. File drop only — not a live DCS, not PAS, not a controller write.

2026-11-06

ISA-18.2 alarm register product page

  • New public page at /alarm: in-browser CSV/XLSX health check, 25-tag watermarked sample, then Alarm Register plus ISA-18.2 rationalization workbook sold by alarm count.
  • Not a live DCS, not PAS/TiPS. Loop-diagram packs stay on /pricing. Homepage remains the IO-list generator.

2026-11-04

Search titles, crawl budget, and cable-schedule intent

  • Cable schedule software, the 10-row CSV tool, and the tools index no longer share one title. Glossary and vendor-guide titles match the queries already in Search Console.
  • /index.html 301s to the homepage origin. robots.txt disallows /index.html so crawlers stop spending budget on a duplicate URL.

2026-10-14

Sample project and guest-upload deletion

  • The homepage preview now has a "Try with a sample IO list" button, plus downloadable sample loop PDF and DXF, so the output can be judged with no client file.
  • Guest preview upload files are auto-deleted after 7 days unless claimed at signup, and a visitor can remove one immediately from the homepage. Only the file is removed; the upload record is retained as an audit log. The confidentiality copy on the homepage, pricing page, and legal pages was updated to match.

2026-10-14

Clearer AI disclosure: mapping vs generation

  • Public copy now states plainly that generation is fully deterministic and no model draws a sheet, while AI-assisted column mapping sends the header row and up to five sample values per column to Google Gemini to label columns.
  • The FAQ, security page, homepage trust card, pricing page, and the in-app disclosure panel were updated to describe both behaviours in one place — mapping never draws, and signed-in mapping calls are recorded in the project audit log.

2026-10-04

PLC tags from the IO list

  • Export CSV, Excel, and Studio 5000 L5X tags from the same IO list as the loop diagrams. One row per signal. BOOL/REAL from signal type. Addresses copied, never invented.
  • Not a controller program. No rungs, AOIs, or TIA XML. Free is the blank template plus a 10-row tool; generated files on free are 15 watermarked tags, no L5X. Paid packs attach the full set when formats are enabled.

2026-10-02

Loop SAT sheets from the IO list

  • Pick continuity, analog, digital, pump, drive, valve, and earth checks. Sheets fill tags, cables, and listed ranges from wired signals. As-found / as-left stay blank.
  • Not a FAT, calibration, or SIL certificate. Free is the blank template plus 15 watermarked generated rows. Paid packs include the full SAT workbook and PDF.

2026-10-02

Honest guest preview for BMS point schedules

  • Guest IO-list preview names a BMS / DDC point schedule instead of asking you to pick a loop tag.
  • Leave an email if you want to hear when a point-schedule mode exists. SchematicForge still generates process-instrument loop diagrams only.

2026-10-01

Trailing-slash redirects and real 404s

  • Public URLs with a trailing slash 301 to the slashless canonical. Unknown paths return HTTP 404 instead of the homepage.
  • Missing pages are noindex so crawlers do not treat them as duplicate home content.

2026-09-25

Internal links and cookie-less analytics

  • Home, tools, templates, and vendor guides now link into cable schedule, termination list, instrument index, and range-low/high pages already in Search Console.
  • Public pages send pageviews to Plausible (no cookies, no banner). App and auth routes are excluded. Localhost does not load the script.

2026-09-25

GSC-backed titles, breadcrumbs, and thicker ranking pages

  • Titles and meta retarget cable schedule software, instrument index, termination diagrams, and range low / range high — queries already in Search Console.
  • Glossary, pillar, guide, and tool pages emit BreadcrumbList JSON-LD and a visible engineer byline. Glossary terms with extra detail now render it.
  • Vendor IO-list guides (DeltaV, PCS 7, Allen-Bradley) and cable-schedule / loop-diagram / termination pillars add worked examples without new URL farms.

2026-09-19

Free tools, templates, and named About

  • About describes a practising automation / electrical engineer with more than ten years. Contact accepts a vendor IO list and returns loop PDF, cable schedule, and termination list within 48 hours.
  • New client-only tools: cable schedule CSV, JB terminal numbering, ISA-5.1 tag check, and 4–20 mA wiring reference. No signup.
  • New ungated XLSX: ferrule labels and loop check sheet. Template pages show columns and example rows.
  • Guides: wire numbering, JB strip layout, Rev B packages, and loop-folder handover. Glossary: ferrule, from-to list, wire number, loop check, IEC 81346.

2026-09-14

Checkout moved to Paddle (merchant of record)

  • Online purchases are now processed by Paddle, which acts as merchant of record and issues the tax invoice.
  • Prices are shown excluding tax; applicable tax is added by Paddle at checkout. Receipts are issued in the app with a link to Paddle's tax invoice.
  • Refunds are submitted to Paddle and may require its review before they are approved.

2026-09-11

Upgrade difference billing, guest retention copy

  • Pack upgrades charge the difference to the next band, not a second full pack price.
  • Public copy matches guest-file retention: uploads are kept until claimed at signup, not a 60-minute wipe.

2026-09-10

Compare JSON-LD, Features and checkout copy

  • Compare pages emit Article JSON-LD. Features and Security state package contents, band overflow as the difference, and NDA/DPA.
  • Paid entitlement and pack checkout copy: Rev B/C inside the band is $0; growth past the band is the difference, not a second pack.

2026-09-10

Pricing honesty: revisions, hours, packs vs credits, NDA

  • Pricing states unlimited Rev B/C inside the purchased loop band; growth past the band is the difference to the next band, not a second full pack.
  • ROI table uses 0.5 h/loop drafting hours (25 h / 75 h) instead of an invented dollar rate. Every paid pack lists PDF, DXF, register, schedules, and QA.
  • Credits are labelled a 12-month multi-project alternative, not the default. Trust strip: DPA, NDA by email, mapping optional, on-prem Docker.

2026-09-10

Free first-15 package, homepage intent, and vendor guides

  • Free package download is a watermarked PDF of the first 15 field-wired loops; DXF stays with the pack. Regenerating a revision inside the band does not buy the pack again.
  • Homepage states the free slice, revision and confidentiality risks, package contents, and pack cost versus billed hours.
  • New cluster pages: generate vs EPLAN, pack vs billed hours, DeltaV / Siemens PCS 7 / Allen-Bradley IO-list guides.

2026-09-10

Crawlable public pages and IO-list checker

  • Production builds prerender every public route so crawlers see titles, copy, and JSON-LD without JavaScript.
  • Homepage dropzone is the primary call to action; guest preview still needs no account.
  • New pages: IO-list checker, loop-register pillar, ISA-5.1 guide, per-template URLs, CAD comparison, and glossary term pages.
  • About and contact pages: practising automation engineer; contact@schematicforge.com, same-day replies. PayPal listed as active.

2026-08-26

Trust pages, legal boilerplate, and SEO noindex

  • Public FAQ, security, privacy, terms, refund, DPA (with downloadable PDF), sub-processors, and changelog pages.
  • Noindex handling for the app and auth routes so only marketing pages compete for search.

2026-08-26

Public site, anonymous parse preview, and full SEO

  • Marketing landing site with pillars, guides, glossary, templates, and a pricing calculator.
  • Anonymous IO-list preview: upload without an account, see counts and detected columns, then carry the upload into signup.
  • Static prerendering of all public pages with per-route meta, JSON-LD, canonical links, and a sitemap.

2026-08-25

Workbook round-trip and re-import

  • Generated Loop Register workbooks re-import with UUID matching, a diff preview, and apply.
  • Only changed loops regenerate, and the delta report lists what to re-issue.

2026-08-25

Core vertical slice (M1)

  • IO list import wizard with automatic column mapping and validation.
  • Auto-assignment of junction boxes, cables, wire numbers, terminals, and drawing numbers.
  • Loop Register workbook export, and deterministic DXF with editable block attributes plus SVG and PDF.
  • Multi-signal and multi-sheet loop generation with continuation flags.
  • Merged PDF and ZIP package export.