Free Cable Schedule Excel template

By Saad, practising automation engineer · Updated 2026-09-25

Cable schedule Excel: one row per field cable with Cable ID, from, to, cores, and loop tag. Use it as a blank or import an IO list to generate the project schedule.

Sheet: Cable Schedule. Includes an Instructions tab and example rows.

Download XLSX

Columns

ColumnRequiredNote
Cable IDYesUnique field-cable identifier
Cable TypeNoe.g. Instrument
Core CountNoDeclared cores, not a sum of signals
From LocationNoUsually the JB
To LocationNoUsually marshalling or the device
Loop TagNoLoop this cable serves
Length (m)NoOptional
RouteNoTray or route note
NotesNoFree text

Example rows

Cable IDCable TypeCore CountFrom LocationTo LocationLoop TagLength (m)Route
C-F-1001Instrument2JB-01PT-1001PT-1001120Tray T1
C-F-2001Instrument2JB-02FT-2001FT-200185Tray T2

First eight columns shown. Download the XLSX for the full sheet.

Importing this workbook works like a vendor IO list — upload it in the IO list checker or on the home page, review the mapping, and create loops.