Free Loop Register Excel template
By a practising automation / electrical engineer with more than ten years · Updated 2026-11-22
The register shape the app exports — Loops and Signals sheets that round-trip.
Sheet: Loops + Signals. Includes an Instructions tab and example rows.
Download XLSXColumns
| Column | Required | Note |
|---|---|---|
| Tag | Yes | Loop tag on both sheets |
| Loop UUID | No | Fill for re-import; blank on a fresh file |
| Signal UUID | No | Fill for re-import; blank on a fresh file |
| Seq | No | Signal sequence within the loop |
| Signal Type | Yes | AI, AO, DI, DO, named types |
| JB Name | No | Junction box |
| Field Cable ID | No | Cable serving the signal |
Example rows
| Tag | Loop UUID | Signal UUID | Seq | Signal Type | JB Name | Field Cable ID |
|---|---|---|---|---|---|---|
| PT-1001 | — | — | 1 | AI | JB-01 | — |
| FT-2001 | — | — | 1 | FI | JB-02 | — |
Why the Loop Register round-trips
The Loop Register is the editable, machine-readable form of the project. Export it, edit tags, cables, terminals, or ranges in Excel, and re-import it — SchematicForge diffs the file and regenerates only the loops that changed.
It is not a one-way report. The Loops sheet holds one row per tag; the Signals sheet holds one row per I/O, so a valve with an analog output and two limit switches stays one loop with three signals.
Loops sheet vs Signals sheet
The Loops sheet carries the tag-level identity: tag, service, area, P&ID, range, and units. The Signals sheet carries the per-I/O detail: signal sequence, signal type, junction box, and field cable.
Loop UUID and Signal UUID columns keep the mapping stable across exports. Leave them blank on a fresh file; keep them when you re-import so the register matches the existing project instead of duplicating loops.
Re-import and diff
A re-import compares the incoming register with the project. Unchanged loops are left alone. Changed loops get a new revision. Removed rows flag deletions rather than silently dropping documentation.
That behaviour is what makes revision control practical on a project with hundreds of loops: you edit the register, and the drawings follow.
Importing this workbook works like a vendor IO list — upload it in the IO list checker or on the home page, review the mapping, and create loops.