Free JB Schedule Excel template
By a practising automation / electrical engineer with more than ten years · Updated 2026-11-22
Every junction box with its location, size, and loop tags.
Sheet: JB Schedule. Includes an Instructions tab and example rows.
Download XLSXColumns
| Column | Required | Note |
|---|---|---|
| JB Name | Yes | Junction box identifier |
| Location | No | Area or unit |
| Type | No | e.g. Field |
| Size | No | Terminal capacity |
| Loop Tags | No | Comma-separated tags |
| Terminal Count | No | Installed terminals |
| Notes | No | Free text |
Example rows
| JB Name | Location | Type | Size | Loop Tags | Terminal Count | Notes |
|---|---|---|---|---|---|---|
| JB-01 | Unit 1 | Field | 24 | PT-1001, PT-1002, PT-1003 | 24 | — |
| JB-02 | Unit 2 | Field | 24 | FT-2001, FT-2002 | 24 | — |
What a JB schedule tracks
The junction box schedule is the field-enclosure census. Each row names a box, its location, its type, its terminal capacity, and the loop tags it serves, plus the installed terminal count.
It is the sheet a construction team uses to mount and populate boxes before the instruments are wired, so an accurate terminal count matters more than prose.
Capacity and spares
Size records the box capacity in terminals; Terminal Count records what is installed. The difference is your spare. Keep the two distinct so a panel shop reads the real order quantity.
When you plan a strip by hand, the free terminal-numbering tool reserves spares from the end of the strip at a percent you choose, then hands the result back to this schedule.
Linking JBs to loops
Loop Tags lists every loop that terminates in the box. That link is what lets the loop sheet, the termination list, and this schedule stay consistent: change the box on the IO list and all three follow.
Importing this workbook works like a vendor IO list — upload it in the IO list checker or on the home page, review the mapping, and create loops.